Building blocks

A new case version may change how a case is split into building blocks, not just its data and process. A migration plan handles this as part of the same run, through the Add building block and Remove building block tabs.

  • Add building block creates one or more building blocks on each migrated case. Each entry selects the building block and version to create, fills the new building block with its own data migration reading from the case, and moves one of the case's processes into it.

  • Remove building block dissolves one or more building blocks on each migrated case. Each entry transfers the building block's data back to the case with its own data migration, and hands its processes back to the case.

A building block can itself contain building blocks, so a building block plan has the same two tabs. There the owner is the migrating building block instead of the case: Add building block creates a block nested inside it, and Remove building block dissolves a nested block.


Adding a building block

1

Open the plan editor and go to the Add building block tab

2

Click Add building block and select the Building block and Version to create

Add building block entry
3

Under the entry's Data migration, click Add patch for each value to carry over. The source reads from the case document, the target writes into the new building block document

4

Under the entry's Process migration, click Add process migration to select the case process to move into the building block and map its activities onto the building block's process

Each entry is a collapsible card, numbered and labelled with the building block and version it creates. Expand a card to configure it; collapse it to see the plan's entries at a glance.

Adding a building block does not start a new process. It moves a process that is already running into the new building block.

The building block is created empty, filled from the case, and then takes over one of the case's running processes. That process keeps its activities and its position, but from then on belongs to the building block. Nothing is started, and nothing is copied. This is what allows a case halfway through its process to keep its progress while the work moves into a building block, and it is also the source of every limitation below.

What adding a building block supports

Capability
Description

Move the case's own process

The work the case was doing becomes work the building block does

Create several building blocks in one plan

A case can have more than one process running at the same time, and each entry takes over one of them

Move a sub-process

If the case's process calls another process, an entry can take over that called process instead of the main one. The result behaves exactly like a building block the case started normally

Fill the new building block from the case

Each entry has its own data migration, reading from the case document and writing into the new building block document

Re-map process activities

Each entry has its own process migration, so the activities of the process being taken over can be mapped onto the building block's process model

Nest inside a building block

On a building block plan, the same tab nests a new building block inside the migrating one

Limitations

This limitation rarely applies when carving work out of a large process into a building block:

  • Cases whose process has not yet reached that work need no building block entry at all. Migrate them normally onto the new version. When the process arrives at the point where the new version calls the building block, the building block is created there and then, exactly as for a new case.

  • The same holds for cases already past that work.

  • Only cases executing that work at the moment of migration are affected. Let the new version keep the old activity alongside the new call for a while, so those cases can be mapped onto the old activity, and drop it in a later version once no case is sitting there.

The remaining limitations:

Limitation
Behavior

No running process means no building block

If a case has no running process for the entry to take over — a closed case, for example — the entry is skipped and no building block is created. The case still migrates and is not reported as failed, but is listed under Cases with warnings with the process that was looked for and not found

Every entry needs a process to take over

An entry that names a building block but no process migration can never create anything, so it is refused on save and again on run. The same applies to an entry naming a process that neither version deploys

The target version must use the building block

A plan can only add a building block version that the target case version links, either as a startable item or through a call in one of its processes. Otherwise the building block would be created once and never migrated again by a later plan, because a building block only moves when the version owning it says which version it should be on

Adding happens before removing

Within one plan, building blocks are added before any are removed, so an entry cannot take over a process that another entry in the same plan is about to hand back. Use two plans chained with Run after plan instead

An entry takes over a whole process instance

There is no way to move only some activities of a running process into a building block

Check the Cases with warnings list after a run, and after a dry run, which reports the same warnings without changing anything. It distinguishes "these cases had nothing to take over" from "this plan never creates anything".


Removing a building block

1

Open the plan editor and go to the Remove building block tab

2

Click Add building block and select the Building block and Version to dissolve

Remove building block entry
3

Under the entry's Data migration, add a patch for each value to transfer back. The source reads from the building block document, the target writes into the case document

4

Under the entry's Process migration, map the building block's processes onto a case process

All building blocks directly linked to the case with the given key are dissolved, after their data and processes are transferred back to the case.


How building blocks follow a case

A building block lives inside a case, so a building block plan is never started by hand. It runs when a case migration moves a building block onto the plan's version, and applies to exactly the building blocks that case migration brings with it. A case that never migrates keeps its building blocks where they are.

Which building block a case's existing block becomes is read from the case's new version: the building blocks it offers as startable items and the ones its processes call.

Situation
Result

The new version links a newer version of the same building block

The block is brought up to that version

The new version links a different building block

The block is carried over to that building block, which is how one building block replaces another without abandoning running instances

This requires a chain of migration plans leading from the version the block is on to the version the case links. The plans' own sources form that chain. One plan may cover the whole jump, or there may be one plan per step — including a step that changes nothing, because every building block version publishes its own process model and a running block must be moved onto it explicitly.

Dry-running the case migration walks the identical chain, so it reports either problem before a real run does. See Running a plan.